
Miners celebrate in front of the "gaby" drill after breaking through the east tube of the Gotthard railway tunnel in Switzerland to connect Erstfeld and Amsteg. Being built at a cost of almost 18 billion Swiss francs (£10 billion), it is scheduled to become the world’s longest tunnel at 60km (40 miles) when it is completed
Arnd Wiegmann/Reuters